Power Plant based on AFBC technology

Power Plant based on AFBC technology
Thermax provided total turnkey solutions to set up the 36 MW captive power plant for large cement manufacturer. The plant has AFBC Boilers that can fire imported coal and pet coke as fuel.

The scope of work included erection and commissioning of two AFBC boilers of 80 TPH each, and 2 x 18 MW condensing type steam turbine generators along with their auxiliaries and air cooled condensers. Thermax took care of the construction and commissioning of 132 KV switch yards. The operation and maintenance (O&M) activities of the entire plant has also being awarded to Thermax.

For early completion of this project the client awarded Thermax a bullet bonus of Rs. 1.5 crore. Thermax has also bagged a repeat order from the company for a 12.1 MW power project based on waste heat recovery from the cement manufacturing process.