Power plant based on proprietroy IR - CFBC technology

Up to 300 MW

Turnkey Power plants with single unit size

Up to 1200 MW

Complete BOP for power plants

Waste heat recovery based power

Cement, iron & steel industries

Power plant based on  proprietroy IR
Thermax provided a proprietary IR-CFBC technology for combustion of coal with wide variation of GCV at this 25 MW captive power plant for a leading chemical industry player.

Thermax scope of work included erection and commissioning of 1 x 110 TPH coal fired CFBC boiler and 1 x25 MW condensing steam turbine along with their auxiliaries. The scope of work also included the total civil work, erection and commissioning of DCS and total instrumentation along with the electrical and mechanical systems and equipments.

This was a brown field expansion, where the layout was designed within the available space. The entire plant was integrated with the existing 25 MW unit to ensure 100% compatibility and synchronous working.